The large heavy steel ring forging workshop is 36 meters high and has an internal crane tonnage of 250 tons. It can produce nuclear power flanges with a diameter of 16 meters and a weight of 126 tons, making it the largest rolled ring forging in the world so far.

It covers an area of 450 mu and has a construction scale of 230000 square meters. Through the landscape axis running through the two sites, a "double core" is created, so that each plot has its own core landscape resources and enterprise supporting space, fully reflecting the concept of green development and humanized design, and creating a one-stop large-scale industrial park complex.

Located in the ecological and cultural area of "Three Rivers, Two Rivers and One Lake" in Boxing County, commonly known as "Moonlight Treasure Box", this project has 6 floors above ground, a building height of 35.85 meters, and a total construction area of 58907 square meters. The difficulty of this project is that only a single arch The beam weighs more than 230 tons.

The high-power chip production project is a provincial and municipal key project. It is mainly an industrial plant with an annual output of 360000 8-inch silicon-based power devices and 120000 6-inch SiC power devices. The construction land area of the proposed project is about 440906.4m, about 662 mu. The total construction area is about 675803.35m. The project is divided into two parts of the first phase and the second phase of construction. The total construction area of the first phase of the project is about 244259.16m.

< 1...345...12 >