The project with a construction area of 58300 square meters. and the amount of steel used is 7893t

The project with a construction area of 32000 square meters. and the amount of steel used is 6830t

The project with a construction area of 40000 square meters, and the amount of steel used is 6600t.

The construction area of the concrete station is more than 80,000 square meters, and the total steel consumption of 60,00 tons.