Minyuan Iron and Steel (Yongcheng)

The steel-making dry dust removal renovation project has a blast furnace elevation of 69 meters, a single steel structure weighs 142 tons, and the overall steel content of the project is more than 14000 tons.

Key words:

Heavy Steel Engineering

Service Hotline:

Product Description

The steel-making dry dust removal renovation project has a blast furnace elevation of 69 meters, a single steel structure weighs 142 tons, and the overall steel content of the project is more than 14000 tons.

Product inquiry